It took the guys from Cool Ponds about 3 days to finish the installation. And with Doug's help, it's taken 3 very long weekend days and several weeknights after work to get the rest of the yard in order.
On the completed list:
- Flagstone path between house and garage
- Stone path to patio
- Stepping stones around strawberry bed by the garage
- Rebuilt poor, abused sod couch into Lawn Armchair (mostly done, still need to buy a roll of sod to finish)
- Cleaned gutters
- Built & installed 2nd rain barrel
- Got koi & goldfish for the pond
- Lots of mulching done
- Finished planting redesigned front prairie bed
- Finished redesigning & turning the veggie beds
- Bought a new fire dish (to replace the ponded-over fire pit)
- Find a contractor to finish fencing the yard
- Plant the rest of the veggie garden
- Buy sod to finish up the lawn furniture remodel
- Prettify the compost bins
- Finish moving the rest of the dirt from the pond excavation
- Plant grass seed around the flagstone path and the nook behind the pond
- Finish planting marginals in the pond
- Create & plant the 2 bog beds around the pond
- Get the cannas & elephant ear tubers out of the basement & plant
- Buy & install a bit more lighting for the pond
- Dig back the mulch & re-edge the pebble patio with bricks
- When the first rain barrel gets empty, raise it up on another level of cinder blocks & paint it (no more bright blue barrel!)
- Get some flower seeds planted around the yard
- Finish more landscaping around the pond
- Continue redesigning the front prairie planting to be more acceptable to the lawn police
- Get the chipper back to the shop to see why it's STILL not running (Sigh)
- Convince the City of Indianapolis that the prairie planting in the front yard is not weeds